How long does it take of the installation and trial running of gas generator machine take?

How long does it take of the installation and trial running of gas generator machine take?
Update Time:2015-08-05
If verything is prepared,the PSA oxygen generator and PSA nitrogen generator  time of installation and trial running is about 2 working days.